Edit Vertices mode
To enter Edit Vertices mode, either select the shape and hit enter twice or select a path and hit enter once.
Deep Selection
You may want to select and edit a specific path when dealing with a group of shapes. You can either find that path in the Hierarchy or you can use Deep Selection to select it directly on the Stage. To select a path within a group on the stage, hold⌘ (Mac) or ctrl (Windows) and click the target path. Alternatively, you can double-click on the path you want to select.
Path Options
Each path in Edit Vertices mode has a set of path options at the top of the Inspector. Done Editing Button The Done Editing button can be used to exit Edit Vertices Mode.